March 29, 2004
[In this update they] finished the retaining wall. [More brick ledge forms] were brought back from Chattanooga when a crewmember went after the “Lull”, for erecting steel. They Pumped 60 cubic yards of concrete into the house and retaining walls. About 40 yards went into the house and 20 yards into the retaining walls.
Looking northeast from midway south retaining wall. Footers in front of truck is back of house. Entrance drive is right center. Covered porch and garage is to right of foundation.

Same place as last picture was taken. Showing concrete truck, pump truck, and some of the north retaining wall.

Standing in front of the sewing room/bedroom, looking northwest, the dining room is in the immediate foreground to the right. The back corner of the house is above the ladder, next to the cutout for a window. To the left of the house is the north retaining wall.

Looking to the southwest, standing in front of where the master bedroom will be. Foyer is to the left of the truck cab, the dining room is to the left of the foyer. The yellow ladder is in the lower garage, right under where the pantry will be. Beyond the ladder is the south retaining wall.

This is taken from the basement level, looking northeast. The position is under the pantry. Starting at the extreme lower left of the foundation, is the bath for the front bedroom in the basement. Now, moving to the right, to the first corner, is the back bedroom in the basement. The first part, that comes back into the basement, is the entrance into the foyer. Where the wall recesses back, is the storage area in the basement, and to the extreme right is the equipment room. Above the bedrooms in the basement, is the master suite on the ground floor. On the ground floor, where the wall recesses back, is the entrance into the foyer. To the right of the foyer is the dining room. All the way to the right, on the ground floor, will be Becky’s sewing room.

|
|